Close Menu
    What's Hot

    Analyst Forecasts What Will Happen In The Last Quarter Of The Year

    XRP Ledger gains traction for $200 billion Japanese market

    Insights on Bittensor Halving & BDAG’s $430M Presale Boom

    Facebook X (Twitter) Instagram
    Friday, October 24
    • About us
    • Contact us
    • Privacy Policy
    • Contact
    Facebook X (Twitter) Instagram
    kryptodaily.com
    • Home
    • Crypto News
      • Altcoin
      • Ethereum
      • NFT
    • Learn Crypto
      • Bitcoin
      • Blockchain
    • Live Chart
    • About Us
    • Contact
    kryptodaily.com
    Home»Ethereum»Energy Department Wants Faster Grid Hookups For High Energy Users
    Ethereum

    Energy Department Wants Faster Grid Hookups For High Energy Users

    KryptonewsBy KryptonewsOctober 24, 2025No Comments2 Mins Read
    Share Facebook Twitter Pinterest Telegram LinkedIn Tumblr Email Copy Link
    Follow Us
    Google News Flipboard
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link

    The US Secretary of Energy has urged the Federal Energy Regulatory Commission (FERC) to write new rules that will make it faster for large electricity consumers, such as AI data centers and Bitcoin mining operations, to directly connect to the power grid.

    In a letter released on Thursday, US Energy Secretary Chris Wright asked the FERC, the independent agency that regulates the interstate electricity grid, to grant expedited reviews and create standardized procedures for large electricity users to hook directly into the high-voltage transmission system, not just local power lines.

    The high-voltage transmission system has a higher voltage capacity than local lines and is typically used by large industrial facilities that consume power at a higher rate.

    “United States electricity demand is expected to grow at an extraordinary pace, due, in large part, to the rapid growth of large loads,” Wright wrote.

    “Although there are several drivers to this demand growth, such as home and vehicle electrification, increasing quantities of large commercial and industrial load, most notably data centers, are connecting rapidly to the transmission system.”

    Bitcoin miners and AI centers would benefit

    S. Matthew Schultz, the CEO of Bitcoin mining company CleanSpark, said in an X post on Friday, that under the rules, FERC would be required to expedite connections for “flexible loads like Bitcoin mining and data centers.”

    “This is a major signal that DOE recognizes the value of flexible demand in strengthening the grid,” he said.

    Source: S. Matthew Schultz

    Bitcoin miners require significant power to operate their mining rigs, which validate transactions and create new blocks. The more miners participate, the higher the hashrate, which helps secure the network.

    Reviews could only take 60 days

    Under the new rules, Wright suggests that expedited reviews on whether large power users can connect would be completed in 60 days, instead of years, provided the applicant meets criteria such as agreeing to pay for any network upgrades that might be required.

    Related: Bitcoin mining just got easier — but not for long, as hashrate roars back

    Wright asks that FERC respond to his letter within the next six months, no later than April 30, 2026.

    Bitcoin mining companies and artificial intelligence data centers have been increasingly competing for access to cheap, sustainable energy, which has been suggested could bring in renewed institutional investment over the next decade.

    Magazine: Binance shakes up Korea, Morgan Stanley’s security tokens in Japan: Asia Express